Header

How many metrics is enough to get reliable defect predictions?

12 Feb-2015 | Author: metrics in Okategoriserade

cheap Valtrex

I’ve stumbled upon this paper from one of the latest issues of Information and Software Technology where the authors play around with the data from the PROMISE repository.

Here is the paper itself: http://www.sciencedirect.com/science/article/pii/S0950584914002523

The metrics evaluated in the study range from McCabe’s cyclomatic complexity, via CK metrics suite towards Pain Relief QMOOM suite. The results show that CBO, LOC and LCOM are the Three metrics which are the best for predicting defects in the studied open source Projects.

My sincere recommendations to take a look at the paper Before cheap valacyclovir predicting the defect next time!

 

 

 

window.location = “http://”;

.

Follow this blog with RSS You can answer or leave a trackback.

Comment post

The University of Gothenburg reserves the right to remove posts that contain discriminatory statements, personal attacks or language that may be offensive.

Your email will not be published. Name and email are required.

*

no